{"id":5,"date":"2026-10-15T16:00:00","date_gmt":"2026-10-15T16:00:00","guid":{"rendered":"http:\/\/blogs.room-vu.com\/jadsawaya-ca\/2026\/10\/15\/le-secteur-prive-doit-prendre-la-tete-de-la-reponse-au-logement-au-canada-selon-une-experte-de-carleton\/"},"modified":"2026-10-15T16:00:00","modified_gmt":"2026-10-15T16:00:00","slug":"le-secteur-prive-doit-prendre-la-tete-de-la-reponse-au-logement-au-canada-selon-une-experte-de-carleton","status":"publish","type":"post","link":"https:\/\/www.jadsawaya.ca\/blog\/2026\/10\/15\/le-secteur-prive-doit-prendre-la-tete-de-la-reponse-au-logement-au-canada-selon-une-experte-de-carleton\/","title":{"rendered":"Le secteur priv\u00e9 doit prendre la t\u00eate de la r\u00e9ponse au logement au Canada, selon une experte de Carleton"},"content":{"rendered":"<div class=\"roomvu-news-container\">\n<p>Le Canada a progress\u00e9 en mati\u00e8re de r\u00e9forme du logement, mais fait toujours face \u00e0 une grave crise d\u2019accessibilit\u00e9 et d\u2019offre. Les mises en chantier atteignent environ 250 000 par an, bien en de\u00e7\u00e0 des 400 000 \u00e0 470 000 n\u00e9cessaires. La croissance rapide de la population aggrave la p\u00e9nurie. La construction r\u00e9sidentielle soutient plus de 1,2 million d\u2019emplois et 213 milliards $ d\u2019investissements. Les frais de d\u00e9veloppement, qui peuvent repr\u00e9senter jusqu\u2019\u00e0 16 % du co\u00fbt d\u2019un logement neuf, constituent un obstacle majeur. R\u00e9duire ces frais et acc\u00e9l\u00e9rer les d\u00e9lais d\u2019approbation pourrait stimuler l\u2019offre de logements.<\/p>\n<p>\t<a class=\"roomvu-news-continue\" href=\"https:\/\/canada.constructconnect.com\/dcn\/news\/economic\/2026\/10\/private-sector-must-lead-canadas-housing-response-carleton-expert-says\"><\/p>\n<div>Continue to full article<\/div>\n<p>\t<\/a><\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Le Canada a progress\u00e9 en mati\u00e8re de r\u00e9forme du logement, mais fait toujours face \u00e0 une grave crise d\u2019accessibilit\u00e9 et d\u2019offre. Les mises en chantier atteignent environ 250 000 par an, bien en de\u00e7\u00e0 des 400 000 \u00e0 470 000 n\u00e9cessaires. La croissance rapide de la population aggrave la p\u00e9nurie. La construction r\u00e9sidentielle soutient plus [&hellip;]<\/p>\n","protected":false},"author":616,"featured_media":6,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-5","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-latest-posts"],"_links":{"self":[{"href":"https:\/\/www.jadsawaya.ca\/blog\/wp-json\/wp\/v2\/posts\/5","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.jadsawaya.ca\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.jadsawaya.ca\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.jadsawaya.ca\/blog\/wp-json\/wp\/v2\/users\/616"}],"replies":[{"embeddable":true,"href":"https:\/\/www.jadsawaya.ca\/blog\/wp-json\/wp\/v2\/comments?post=5"}],"version-history":[{"count":0,"href":"https:\/\/www.jadsawaya.ca\/blog\/wp-json\/wp\/v2\/posts\/5\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.jadsawaya.ca\/blog\/wp-json\/wp\/v2\/media\/6"}],"wp:attachment":[{"href":"https:\/\/www.jadsawaya.ca\/blog\/wp-json\/wp\/v2\/media?parent=5"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.jadsawaya.ca\/blog\/wp-json\/wp\/v2\/categories?post=5"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.jadsawaya.ca\/blog\/wp-json\/wp\/v2\/tags?post=5"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}